Sunrise Villas faced multiple challenges, from elderly residents at home during the day to weather delays and missing materials, yet CWC delivered a safe, efficient, and minimally disruptive roofing replacement that kept the project on schedule and on budget.
The large mixed-income housing complex at Sunrise Villas presented several challenges. With many elderly residents often at home during the day, crews had to work efficiently without blocking walkways, disturbing residents, or occupying more space than necessary on the site.
To make matters more complex, the project faced unpredictable weather and some missing materials, while the existing roofs required careful removal and cleanup. Debris control, safety, and keeping the buildings properly dried in each day were critical to maintaining both progress and resident comfort.
CWC responded with a precision-focused approach, maintaining strict safety protocols while coordinating work zones to minimize disruption to residents. The team ensured that every step of the project was organized, clean, and respectful of the community, even when unexpected weather and missing materials created additional challenges.
Despite these logistical complexities, CWC’s experience with multi-family projects allowed the team to adapt seamlessly, shifting crews and schedules as needed to complete the project efficiently. Residents were able to continue their daily routines uninterrupted, and the roofs were properly dried in each day, ensuring both safety and quality throughout the process.
Fast, precise work with minimal disruption
Time management and careful planning were critical to the Sunrise Villas project. The CWC project management team coordinated every step of the roof replacement to ensure the work was completed safely, efficiently, and with minimal impact on residents, many of whom were home during the day.
Thanks to our experience and detailed project planning, CWC successfully completed the replacement of all damaged roofing, installation of proper drainage crickets, and integration of a durable underlayment and flashing system, restoring functionality to every building in the community.
To achieve these results on schedule despite weather delays and missing materials, CWC deployed skilled crews, used specialized equipment, and maintained strict safety protocols on-site daily. The project was completed efficiently, leaving residents with safe, fully functional, and durable roofs that meet high-quality standards.
Prioritizing the well-being of residents and crew
With multiple buildings, tight work areas, and elderly residents often at home during the day, safety was the top priority throughout the Sunrise Villas project. CWC maintained constant focus on protecting both residents and crew members during every phase of the roofing work.
We implemented safety perimeters around each building, stationed monitors on the ground, and used cones to guide pedestrian traffic. All crew members working on the roofs were roped and harnessed according to OSHA standards, ensuring that everyone — residents and workers alike — remained safe while allowing the team to complete the project efficiently and without incident.
Roofs built to last
At Sunrise Villas, CWC didn’t just repair the existing roofs — we installed a durable roofing system designed to protect the buildings for decades. Using high-quality materials, including a 2-layer Polyglass underlayment, new flashings, and durable roof tiles, we ensured long-term protection against weather, leaks, and general wear.
Our experienced superintendents oversaw the project to make sure all systems were installed to code and according to manufacturer specifications. Residents can now feel confident that their roofs are both visually appealing and built to last, providing reliable, worry-free protection for years to come.
Keeping clients informed every step of the way
Large projects like Sunrise Villas come with logistical challenges, unexpected weather delays, and site complications. CWC’s team has the experience and know-how to adapt to any job site, ensuring work progresses smoothly and efficiently.
Throughout the project, we maintained daily communication with the homeowners association and residents, keeping everyone informed of schedules and progress. Our field management team adjusted quickly to challenges, ensuring the project stayed on track, on budget, and met the client’s expectations for safety, timing, and quality.